Work Experience - 2011

2011

Offshore Pipeline Freespan Rectification Project, Thailand


CLIENT : PTT Public Company Limited

Installation of grout bags to125 location to rectify offshore pipeline free span by ROV.

(Depth : 70m / Mar. - Jun. 2011)

Bongkot 3H4A & Arthit 1D Offshore Installation Campaign, Thailand


        
OWNER / OPERATOR : PTT Exploration and Production Public Co., Limited
CLIENT : Nippon Steel Engineering Co., Ltd

Air and saturation diving services for installation of pipeline/platform/riser and tie-in spool

(Depth : 80m / Jan. - Jul. 2011)

Chevron Offshore Pipeline Installation Campaign 2011, Thailand


        
OWNER / OPERATOR : Chevron Thailand Exploration and Production, Ltd
CLIENT : Nippon Steel Engineering Co., Ltd

Air and saturation diving services for installation of pipeline/platform/riser and tie-in spool

(Depth : 80m / Jan. - Aug. 2011)

Chevron Offshore Installation Campaign 2011, Thailand


        
OWNER / OPERATOR : Chevron Thailand Exploration and Production, Ltd
CLIENT : EMAS Offshore Construction and Production Pte Ltd

Air and saturation diving services for installation of pipeline/jacket/riser and tie-in spool

(Depth : 80m / Dec. 2010 - July 2011)

Block 12W Chim Sao Field Development Project, Vietnam


        
OWNER / OPERATOR : Premier Oil Vietnam Offshore B.V.
CLIENT : EMAS Offshore Construction and Production Pte Ltd

Saturation diving service for installation of FPSO, risers, subsea facilities, freespan rectification.

(Depth : 100m / Jun. - Aug. 2011)

Provision of Transportation and Installation of East Pitau and Puteri Pipelines Restoration for Year 2011, Malaysia


        
OWNER / OPERATOR : Newfield Peninsula Malaysian Inc. / ExxonMobil Exploration and Production Malaysia Inc.
CLIENT : SARKU Marine Sdn Bhd

Saturation diving service for installation of offshore tie-in spool and risers.

(Depth : 60m / Apr.-Jul. 2011)

Decommissioning of SPP Boat Landing Project, Thailand


CLIENT : PTT Exploration and Production Public Company Limited

Detail engineering of lifting analysis and decommissioning of boat landing

(Depth : 5m / Jul. 2011)

PL2 Life Extension Project, Papua New Guinea


OWNER / OPERATOR : Oil Search Limited
CLIENT : EMAS Offshore Construction and Production Pte Ltd

Phase-1: Air diving services for pipe laying assistance, Riser and spool tie-in works, Spool support installation, SBM buoy, anchor piles, submarine/floating hose installation

(Depth : 35m / Jun.-Dec. 2011)

Post-Earthquake Survey of Subsea Facilities, Kuji, Japan


CLIENT : Idemitsu Engineering Co., Ltd.

Post-Earthquake survey for subsea facility (PLEM, buoy base etc.) and work vessel operation

(Depth : 24m / Aug. 2011)

Iwafune Offshore Platform Inspection Project, Niigata / Japan


OWNER / OPERATOR : Japan Petroleum Exploration Co., Ltd (JAPEX)
CLIENT : JAPEX Offshore Ltd. (JPO)

Air diving services for offshore facility general subsea inspection and maintenance work

(Depth : 36m / Jun. - Jul. 2012)

Water seepage treatment at Mitaka Testing Pool, Tokyo, JAPAN


CLIENT : National Maritime Research Institute

Air diving services to place water seepage treatment

(Depth : 8m / Mar. 2012)

Measurement dam wall undulation at Tsuruta Dam, Kagoshima, JAPAN


CLIENT : Hitachi Zosen Co., Ltd.

Pre-installation work of cofferdam and take undulation measurement of dam wall

(Depth : 43m / Apr.-Jul. 2012)

Kushikino Offshore Facility Maintenance (2011), Kagoshima, JAPAN


OWNER / OPERATOR : Japan Underground Oil Storage Co., Ltd.
CLIENT : Tonen Technology GK

Project Engineering and air diving services for offshore facilities maintenance, year 2011

(Depth : 27m / Aug. 2011 - Jan. 2012)

Sakhalin-1 Project Arkutun-Dagi Offshore Pipeline Installation", Russia


OWNER / OPERATOR : Exxon Neftegas Limited (ENL)
CLIENT : JOINT STOCK COMPANY MEZHREGIONTRUBOPROVODSTROY(JSC MRTS)

Air diving services for offshore pipeline installation

(Depth : 40m / Jun. - Aug. 2011)

Installation of Oceanographic Observation Device, Fukui, JAPAN


CLIENT : Mitsui Engineering & Shipbuilding Co., Ltd.

Air diving services for installation of oceanographic observation device

(Depth : 45m / May 2011)

Offshore Facility Maintenance, Aomori / JAPAN


CLIENT : Mutsu Ogawara Oil Storage Co., Ltd

Long term contract of air diving services for offshore facilities maintenance

(Depth : 45m / Apr. 2011 - Mar. 2012)

Iwafune Offshore Platform, Replacement of Water Outlet line Nigata / JAPAN


OWNER / OPERATOR : Japan Petroleum Exploration Co., Ltd (JAPEX)
CLIENT : JAPEX Offshore Ltd. (JPO)

Pre-survey, fabrication, installation of subsea water outlet line and clamps

(Depth : 36m / Jun. - Oct. 2011)

Repair of No.1 Mooring Dolphin, Okinawa / JAPAN


OWNER / OPERATOR : Nansei Sekiyu K.K. (PETROBRAS Group)
CLIENT : Taisei Co., Ltd.

Repair of damaged mooring dolphin

(Depth : 15m / Jun. 2011)

Iwafune Offshore Platform Removal of Marine Growth, Nigata / JAPAN


OWNER / OPERATOR : Japan Petroleum Exploration Co., Ltd (JAPEX)
CLIENT : JAPEX Offshore Ltd.

Air diving services for marine growth removal and general platform maintenance work

(Depth : 36m / May - Aug. 2011)

Navigation Buoy Inspection, Aomori / JAPAN


OWNER / OPERATOR : Japan Nuclear Fuel Ltd.
CLIENT : Penta-Ocean Construction Co., Ltd.

ROV subsea inspection work for Navigation buoy

(Depth : 45m / Nov. 2010, May 2011)