Work Experience - 2014

2015

Tanker Loading Facility Maintenance, Jurong, Singapore


CLIENT : Banyan Caverns Storage Services Pte Ltd (Vopak)

by SRP (SCUBA Replacement)

(Depth : 5m / Aug. & Dec. 2015)

CALM Tanker Loading Facility Maintenance, Chiba, Japan


CLIENT : Toyo Construction Co., Ltd. (COSMO Oil)

by SSDS (Surface Supplied Diving)

(Depth : 25m / Jan. & Dec. 2015)

Bongkot & Arthit Offshore Installation Campaign 2015, Thailand


CLIENT : Nippon Steel & Sumikin Engineering Co., Ltd. (PTTEP)

by SAT & SSDS (Saturation Diving & Surface Supplied Diving)

(Depth : 0~80m / Feb.~Nov. 2015)

Iwafune Platfom Maintenance, Niigata, Japan


CLIENT : JAPEX Offshore, Ltd. (JAPEX)

by SSDS (Surface Supplied Diving)

((Depth : 0~35m / Jul.~Aug. 2015)

Asti-Mila Development Project, Surabaya, Indonesia


CLIENT : PT TIMAS Suplindo (CNOOC Indonesia)

by SSDS (Surface Supplied Diving) System Rental

(Depth : 0~25m / Jul. & Aug. 2015)

Chevron Thai Installation Campaign 2015, Thailand


CLIENT : Solstad Offshore Asia Pacific Ltd. (Chevron Thailand)

by SSDS (Surface Supplied Diving)

(Depth : 0~10m / Apr.~Aug. 2015)

Bukit Tua Offshore Development Project 2015, Surabaya, Indonesia


CLIENT : PT Sigur Ros. (Petronas Ketapang II)

by SAT (Saturation Diving) System Rental

(Depth : 55m / May.~Aug. 2015)

Bekapai Phase-2 Development Project, Surabaya, Indonesia


CLIENT : PT TIMAS Suplindo (TOTAL Indonesia)

by SSDS (Surface Supplied Diving)

(Depth : 0~45m / Apr.~Jul. 2015)

Tanker Loading Dolphin Remedial Project 2015, Jurong, Singapore


CLIENT : McConnel Dowell SEA Pte Ltd, (Universal Terminal Pte Ltd)

by SRP (SCUBA Replacement)

(Depth : 0~20m / May. 2015)

Nong Yao Field Installation Project 2015, Thailand


CLIENT : Nippon Steel & Sumikin Engineering Co., Ltd. (Mubadala Petoleum)

by SAT & SSDS (Saturation Diving & Surface Supplied Diving)

(Depth : 0~80m / Feb.~May. 2015)

Tsuruta Dam Rectification Phase-6, Kagoshima, Japan


CLIENT : Hitachi Zosen Co., Ltd. (MLIT)

by SAT & SSDS (Saturation Diving & Surface Supplied Diving)

(Depth : 0~60m / Jan.~May. 2015)

Bukit Tua FPSO Installation Project, Surabaya, Indonesia


CLIENT : Franklin Offshore International Pte. Ltd. (M3ENERGY)

by SAT (Saturation Diving)

(Depth : 55m / Jan.~Mar. 2015)

Ise Wan Sea Berth Subsea Pipeline Maintenance, Nagoya, Japan


CLIENT : Toa Corporation (Idemitsu Kosan)

by SSDS (Surface Supplied Diving)

(Depth : 0~30m / Oct. 2014~Jan. 2015)